Sprinter Rail
H&H, a dedicated subcontractor to joint/vent FCI.Fluor (West Coast Rail Constructors) The project, between Escondido and Oceanside, included removal of 22 miles of existing track, 32 miles of new trac...


Valley Metro Rail LS3 Phoenix, AZ
H&H Engineering Constuction Inc. was the Sub Contractor (to Archer/Western Contractors) on the VMR LS3 Project through downtown Phoenix, which provided start up Light Rail service for the Valley on 12...


SRT Watt Ave Grade Separation
H&H Engineering Constuction Inc. was the Sub Contractor (to Viking Construction) on this project. An overpass was constructed for Sacramento Rail Transit to bypass the heavy congestion on Watt Ave at ...


SRT NE Corridor Lumberjack Realignment
The Lumberjack Realignment project was a stategic upgrade that removed a section of track that was high maintenance (tight curve) and two signal road crossings. The project consisted of: Remove an...